Autodesk Announces Powerful New Model Coordination Workflow for BIM and VDC Managers
Before a construction project breaks ground, Navisworks empowers general contractors to identify and resolve clash and constructability issues, and BIM 360 Model Coordination enables design and trade partners to create, track and self-check issues that arise during the model coordination process. Now, users can automate clash detection in BIM 360 Model Coordination, as well as create and assign issues from either Navisworks or BIM 360. This new workflow enhances existing coordination workflows for Navisworks users and empowers BIM 360 Model Coordination users to do more specific clash detection and analysis in Navisworks.
"With the integrated workflow of Navisworks and BIM 360, all project stakeholders from the field to the office are able to now participate in issue tracking and resolution throughout the project lifecycle," said
New workflow empowers anyone to be involved in the model coordination process
The new workflow between desktop-based Navisworks with cloud-based BIM 360 Model Coordination enables more project partners to be involved in the model coordination process at any time. Design and trade teams can self-check their models in real-time using automated clash detection, while a BIM leader can focus time and resources on the largest constructability issues and open up an evolving data set in Navisworks to run specific cross-discipline class tests on the latest design data.
For example with the new workflow, if a structural team uploads a model to BIM 360 Model Coordination and as a result of the solution's automated clash detection, notices a clash between the stairwell and a basic wall, they can assign an issue to their team: "wall incorrectly positioned in front of curtain wall – check structural integrity." The issue can then be tracked and resolved before the model is sent to the general contractor's VDC lead. The model can also be opened in Navisworks where specific rules are applied and a user's expertise taken into consideration to check for larger constructability issues. For instance, the VDC manager may notice the positioning of an air handling unit will make it difficult for maintenance, requiring plumbing and HVAC to re-route their systems. The manager can then assign issues to both plumbing and HVAC partners directly from Navisworks and request a design fix – enabling the VDC manager to track the issue to resolution all from within Navisworks.
"To avoid the schedule and cost overruns that come with rework, construction firms need to be able to address design issues before construction starts," said
The integration between Navisworks and BIM 360 Model Coordination is now available. For more details and key features, check out our blog post here. Also read about the 25 other product updates made to the Autodesk Construction Cloud portfolio announced today here.
About Autodesk
Autodesk makes software for people who make things. If you've ever driven a high-performance car, admired a towering skyscraper, used a smartphone, or watched a great film, chances are you've experienced what millions of Autodesk customers are doing with our software. Autodesk gives you the power to make anything. For more information visit autodesk.com or follow @autodesk.
Safe Harbor Statement
We may make statements regarding planned or future development efforts for our existing or new products and services. These statements are not intended to be a promise or guarantee of future delivery of products, services or features but merely reflect our current plans, which may change. Purchasing decisions should not be made based upon reliance on these statements. The Company assumes no obligation to update these forward-looking statements to reflect events that occur or circumstances that exist or change after the date on which they were made.
Autodesk, the Autodesk logo, Autodesk Construction Cloud, Navisworks and BIM 360 are registered trademarks or trademarks of
View original content to download multimedia:http://www.prnewswire.com/news-releases/autodesk-announces-powerful-new-model-coordination-workflow-for-bim-and-vdc-managers-301135495.html
SOURCE
Paul Chalker, Autodesk, paul.chalker@autodesk.com